Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Project settings

To configure the settings for a project, it is necessary to connect as an administrator for this project (See Security).

Add a project

Adding a project to Sonar is not done through the web interface, but automatically when the project is analyzed.

Delete a project

You can suppress a project in Sonar by going to the projects settings.

Exclude resources

It is possible to exclude resources from a project by going to settings. To exclude sources, you can use wildcard patterns. Example : */generated/ or */*Bean.java

To add links to your project, go to Settings.

Plugins configuration

Several plugins can be configured at project level to override Global settings for that project.

Add an event

In order to add an event, sign in, go to the project area and choose the component (project, module, package) you want to associate the event to :



Click add event



Enter the event name, the event date, the event category and an optional description. Click create to confirm.

Edit an event

In order to edit an event, sign in, go to the project area and choose the component (project, module, package) in which you want to edit an event :



Click on the edit button



Edit the information you want to change and click update to validate.

Remove an event

In order to remove an event, sign in, go to the project area and choose the component (project, module, package) in which you want to delete an event :



Click on the delete button and confirm.

Add manual measures

In order to add a manual measure to a project, sign in and go to the project page. At the bottom left of the page, you have the possibility to add a measure :



You are presented with a form allowing to enter a new manual measure:



Choose the metric to enter the measure against, the date the measure was taken, the measure value and optionally a summary and a link. Click on Submit to create the measure.

Updating a measure

In order to update the value of a measure, simply add the measure again with the new value. This will override the existing measure.

Deleting a measure

In order to delete a manual measure in a project, sign in and go to the project page. At the bottom left of the page, you have the existing measures :



Press the delete button and confirm suppression

  • No labels